Appendix 11.2.10
Transmission Infrastructure Achievement during 2024-25

Sl. No Voltage Level (kV) Substations (Nos) Transmission Lines (Ckt-km) Capacity addition/enhancement(MVA)*
1 400 0 0 0
2 220 0 0 0
3 110 3 45.74 164.7
4 66 0 -14.3** 9.7
5 33 3 47.85 25
Total 6 79.29 199.4

*Net capacity added: 199.4 MVA
** dismantling considered
Source: KSEBL