Appendix 11.2.10
Transmission Infrastructure Achievement during 2024-25
| Sl. No | Voltage Level (kV) | Substations (Nos) | Transmission Lines (Ckt-km) | Capacity addition/enhancement(MVA)* |
| 1 | 400 | 0 | 0 | 0 |
| 2 | 220 | 0 | 0 | 0 |
| 3 | 110 | 3 | 45.74 | 164.7 |
| 4 | 66 | 0 | -14.3** | 9.7 |
| 5 | 33 | 3 | 47.85 | 25 |
| Total | 6 | 79.29 | 199.4 | |
*Net capacity added: 199.4 MVA
** dismantling considered
Source: KSEBL