Appendix 11.2.7
Ongoing Hydroelectric Generation Projects of KSEB
| Sl.No | Name of the Project | Installed Capacity (MW) | Energy Potential(MU) |
| 1 | Mankulam Hydro Electric Project | 40 | 82.08 |
| 2 | Chinnar Small Hydro Electric Project | 24 | 76.45 |
| 3 | Olikkal SHEP | 5 | 10.26 |
| 4 | Poovaramthodu SHEP | 3 | 5.88 |
| 5 | Pazhassi Sagar SHEP | 7.5 | 25.16 |
| 6 | Bhoothathankettu SHEP | 24 | 83.5 |
| 7 | Sengulam Augmentation Scheme | 85 | |
| 8 | Upper Sengulam SHEP | 24 | 53.22 |
| 9 | Poringalkuthu Micro HEP | 0.036 | 0.25 |
| Total | 127.54 | 421.8 | |
Source: KSEBL