Appendix 11.2.8
Existing Small Hydro Projects owned by KSEBL
| Sl.No | Name of the Project | Installed Capacity (MW) |
| 1 | Poringalkuthu Micro | 0.011 |
| 2 | Peechi | 1.25 |
| 3 | Mattupetty | 2 |
| 4 | Upper Kallar | 2 |
| 5 | Urumi Stage II | 2.4 |
| 6 | Malampuzha | 2.5 |
| 7 | Chimmony | 2.5 |
| 8 | Chembukadavu Stage I | 2.7 |
| 9 | Peppara | 3 |
| 10 | Kakkayam | 3 |
| 11 | Lower Meenmutty | 3.5 |
| 12 | Adyanpara | 3.5 |
| 13 | Vellathooval | 3.6 |
| 14 | Chembukadavu Stage II | 3.75 |
| 15 | Urumi Stage I | 3.75 |
| 16 | Kuttiadi Tailrace | 3.75 |
| 17 | Ranni - Perinad | 4 |
| 18 | Poozhithode | 4.8 |
| 19 | Perunthenaruvi | 6 |
| 20 | Chathankottunada stage II | 6 |
| 21 | Peruvannamuzhi SHEP | 6 |
| 22 | Vilangad | 7.5 |
| 23 | Malankara | 10.5 |
| 24 | Kallada | 15 |
| 25 | Barapole | 15 |
| 26 | Poringalkuthu Left Bank Extension | 16 |
| 27 | Poringalkuthu New | 24 |
| 28 | Neriamangalam Extension | 25 |
| Total | 183.011 | |
Source: KSEBL