INFRASTRUCTURE218

                  •	 Detailed Project Reports have been prepared for implementing City Road Improvement
                      Projects in Kottayam, Thrissur, Malappuram and Kannur and action is also in progress for
                      preparing DPR for Kochi and Kollam city road improvement projects.

        State Road Improvement Project (SRIP)

             	
             5.14 The State Road Improvement Project (SRIP) envisages to improve and upgrade 1200 Kms
             of State Highways and Major District Roads to enhance the capacity and riding quality with proper
             maintenance plan, road safety and reducing the expenditure on periodic maintenance. The project is
             implemented by Road Infrastructure Company Kerala (RICK) Ltd. The project is implemented under
             two packages, i.e the Rehabilitation Package under Annuity mode and the Upgradation Package
             with funding from multilateral funding agencies. The Rehabilitation package is intended to improve
             551 Kms of roads on Public Private Partnership Annuity mode and the Upgradation Package is
             designed to improve 600 Kms of road by including land acquisition wherever needed for geometrical
             corrections and junction improvements.

        Research and Development in Road Sector

             5.15 Research and Development activities have an important role to play in meeting the challenges
             of modernising the road system, technology upgradation and finding cost effective solutions to
             infrastructure problems in general. Design, Research, Investigations and Quality Control Board
             (DRIQ Board), Kerala Highway Research Institute (KHRI) and National Transportation Planning and
             Research Centre (NATPAC) are engaged in research and Development of the road sector.

         (a) DRIQ Board

             5.16 The main activities of the DRIQ Board is rendering service to the public by way of undertaking
             structural design, field investigation, project preparations and quality control work for the effective
             implementation of projects under plan schemes for PWD. In 2013-14 the design wing of DRIQ Board
             has completed 53 numbers of structural design. The Bridges Design Wing has completed structural
             design of 157 numbers of bridges and 40 numbers of general design and 80 numbers of detailed
             design. The research and project preparation unit of DRIQ Board has completed the draft final
             DPR of KSTP Phase II project roads in Alappuzha, Kottayam and Thiruvananthapuram. Alignment
             preparation and DPR preparation of the proposed road through Ernakulam- Sabarimala road is in
             progress.

         (b) Kerala Highway Research Institute

             5.17 Kerala Highway Research Institute is the South Zone Regional Office of quality control wing
             for quality control assurance of all works undertaken by PWD. KHRI conducts training programmes
             for technical and non technical staffs of PWD. The functioning of the Institute is under four divisions.
             The activities of KHRI during 2013-14 is given Box 5.2